Commit Graph
6 Commits
Author SHA1 Message Date
Craig Lawson b68367b04f Harden the egress recovery job after a second review pass (#3937)
- Schedule the recovery job before recording the degraded transition,
  so a crash between the two leaves a stray row (removed on the job's
  first run) rather than a degraded state nothing is polling
- Count any HTTP response, including 4xx/5xx, as reachable for http
  targets; only a transport failure counts against egress
- Cascade a deleted notification out of egressNotifications with an
  atomic $pull in the settings repository, after the team-scoped delete
- Handle two processes racing the first egress state insert
- Address global job rows by one key (deleteGlobalJob on _id) and
  restore the deleteByIdAndType signature
- Inject net into PingProvider like PortProvider
- Integration tests for MongoEgressStateRepository and the global-row
  delete methods on the jobs repository

🔧
2026-09-15 08:59:13 +01:00
Craig Lawson ec01a5dfe4 Add egress state and probe service (#3937)
Adds the EgressService that probes a configurable set of reliability targets
(ping, TCP or HTTP) when asked, persists a single instance-wide egress state
document, and runs a recovery poll loop while egress is degraded. Adds the four
egress settings fields with validation. The worker constructs and initialises
the service but nothing calls assessAfterFailure yet, so behaviour is unchanged.

🔧
2026-09-14 10:34:12 +01:00
Alex Holliday edd9335e96 add gloabl proxy to app settings 2026-08-20 11:16:07 -07:00
Alex Holliday 3eadb99c5e protected -> private as no class inherits 2026-07-20 10:01:48 -07:00
Alex Holliday 825a81d326 extract shared mongo mapper utils 2026-07-15 10:20:16 -07:00
Alex Holliday d022f7d849 reorg to domain and api 2026-06-09 12:34:15 -07:00